RPAS-O-C-1-600×850-UL-OC1-O-3P380
1. Combination of oil coating and spring pre-tightening station achieve smaller working area, easy operation, time saving and improve efficiency.
2. With the cooperation of tooling, air cylinder, and motor drive, realizing the automation assembly of parts.
3. Using sensors to detect various part picking and placement, prevent assembly misplacement.
4. Using motor or sensor to test the spring preloading force, distinguish between qualified products.
5. Only required quickly replacement on two sets of fixture tools, able to process of various similar products.
Model | RPAS-O-C-1-600×850-UL-OC1-O-3P380 |
Power Supply | 3-phase 380±10%V, single phase 220±10%V 50Hz |
Power | 2 kW |